Nigeria - Obtain Permit or License for Natural Gas Plant Facility
ProcedureEdit
Apply In-Person:
- To obtain permit or license for Natural Gas Plant Facility in person, the applicant has to make an application to the Director of Department of Petroleum Resources.
- The address and contact details of DPR can be found in the following contact link
- Visit the office and obtain an application form for license to establish a Natural Gas Plant Facility from the relevant department.
- Make sure that you have all the documents listed in the “Required Documents” section of this page.
- Complete the application form and attach the documents (as required) with the completed application. Submit it to the Director.
- After necessary verification and evaluation, if the application is found sufficient, the Director may grant the applicant the licence to establish the Gas plant consequent upon which the applicant may proceed with the detailed Engineering.
- On receipt of Licence to establish, applicant shall submit the detailed engineering design reports of the gas plant facility to the Department of Petroleum Resources.
- The applicant will also make formal presentation of the detailed engineering package to the Department.
- On doing so, the Director may grant the applicant an approval to construct the gas plant once after the submitted design is found sufficient and compliant.
- Further, the applicant company will proceed to mechanically erect and install of the plant.
- Upon mechanical completion of the plant, a pre-commissioning inspection of the facility shall be carried out by the Department prior to the issuance of operating licence.
- If the stipulated pre-requisites have been furnished properly during the inspection, the applicant’s request for license to operate will be approved.
- Then, the applicant will be notified through phone or email and asked to collect the document.
Required DocumentsEdit
Refer the following document for required documents list: - guidelines
LICENSE TO ESTABLISH: Section 1.2.1
APPROVAL TO CONSTRUCT: Section 2.0
LICENSE TO OPERATE:Section 3.1
Office Locations & ContactsEdit
Department of Petroleum Resources - Head Office,
Ministry of Petroleum Resources,
Block D, NNPC Towers,
Herbert Macaulay way,
Central Business District, Abuja.
Tel: (09) 460 84820
Email: [email protected]
Website: Link
EligibilityEdit
Any organization in Nigeria that intends to establish, construct or operate a Natural Gas Facility in Nigeria, can apply.
FeesEdit
Please approach the office for fees details.
ValidityEdit
The license is valid for period of two years.
Documents to UseEdit
Please attach documents that can be used by people. e.g. links
Sample DocumentsEdit
Please attach sample completed documents that would help other people.
Processing TimeEdit
Please explain processing time taken in obtaining the document/certificate.
Related VideosEdit
Videos explaining the procedure or to fill the applications. Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites. Please remove the '&' inside the tags during implementation. Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver, sevenload, viddler, vimeo, youku, youtube width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed. e.gIn the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.
InstructionsEdit
- Applicants are advised to complete the application form neatly and completely with absolute legibility and appropriateness to avoid rejections. Also, all the required documents must be furnished completely.
- The applicants can make use of the following guidelines document for completion of application process: - guidelines
Required InformationEdit
- Name and Nationalityof Company
- Registered Address in Nigeria
- Available capital
- Proposed location and type of plant
- Refining / Plant capacity range
- Proposed source(s)
- Products to be produced
- Detailed specifications of products
- Proposed market for products produced
- Gross estimation
- Any relevant details
Need for the DocumentEdit
To establish, construct or operate a Natural Gas Plant facility in Nigeria, a permit/license from the Department of Petroleum Resources is mandatory.
Information which might helpEdit
Enter other information which might help.
Other uses of the Document/CertificateEdit
Please explain what are other uses of obtaining this document/certificate. e.g. Birth Certificate can be used as proof of identity.
External LinksEdit
Place some external links which might help.
OthersEdit
More information which might help people.