Ghana - Obtain Permit or License for Wave Generation Sources
Advertisement
ProcedureEdit
Apply In-Person
- Applicant who would like to apply for License for Wave Generation Sources, the applicant should contact the energy commission office in Ghana Contact link
- Applicant must obtain the application form from the relevant department.
- Read carefully through the application form as there contain different section.
- Applicant must make sure to carry all necessary documents that are mentioned under “Required Documents” section of this page.( Both photocopies and originals)
- Please refer to the fees details in the “Fees” section of this page.
- The Applications form should be completed and submitted to the customer service representative.
- Submit the completed form in two copies along with the supporting documents to the respective office.
- This application will be processed and information will be verified by the NPA.
- If the verification is successful, the notification will be sent to the applicant.
- After the notified period applicant gets certificate as per applicable delivery norms.
Advertisement
Required DocumentsEdit
- Application form
- Property of tax receipts
- Certified copy of proof of ownership of the property, such as sale deed.
- If the applicant is not the property’s owner, consent letter from the owner in form format or valid proof of occupancy.
- National identification card.
- Residential address proof
Office Locations & ContactsEdit
Electricity Commission Office of Ghana
Address: Electricity Commission Office of Ghana
Corporate office, Accra, Ghana.
Contact number: +233 30 261 1611
Location link
Website Link
Address: Energy Commission office
EMOP Secretariat.
Private Mail Bag,
Ministries Post Office,
Accra - Ghana.
E-mail: [email protected]
Tel: +233 (0)302 908193 /+233 (0)302 813 756/7
Contact link
EligibilityEdit
- Ghanaians/companies are eligible for this application.
FeesEdit
- Processing Fee for this procedure is GHS 200.00
ValidityEdit
Explain the time until which the certificate/document is valid. e.g. Birth Certificate Valid Forever
Documents to UseEdit
Please attach documents that can be used by people. e.g. links
Sample DocumentsEdit
Please attach sample completed documents that would help other people.
Processing TimeEdit
- The processing time for this procedure is 3 or 5 days.
Related VideosEdit
Videos explaining the procedure or to fill the applications. Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites. Please remove the '&' inside the tags during implementation. Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver, sevenload, viddler, vimeo, youku, youtube width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed. e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.
InstructionsEdit
- The enactment of the Electricity Corporation Decree, 1967 (NLCD 125) and the repeal of the Electricity Act, established the Electricity Corporation of Ghana (ECG). For the next two decades, ECG was to remain the entity solely responsible for electricity supply and the distribution networks nationwide.
Required InformationEdit
- Applicant name
- Contact number
- Residential address (full details)
- Postal address
- Applicant details
- State and nationality
- Pin code number
- Company particulars
- Declaration
Need for the DocumentEdit
- Applicant will need planning permission to install any domestic or community wave energy system, even a small scheme to power a single home.
Information which might helpEdit
Enter other information’s which might help.
Other uses of the Document/CertificateEdit
Please explain what are other uses of obtaining this document/certificate. e.g. Birth Certificate can be used as proof of identity.
External LinksEdit
OthersEdit
More information which might help people.