Ethiopia - Apply Electricity Permit For The Building


Advertisement

ProcedureEdit

Apply In Person

  1. To Apply Electricity Permit for Building, the applicant has to visit the Ethiopian Electric Power Corporation link
  2. The applicant has to get the form from the respective office to get the electricity permit for the building.
  3. Applicant must enter all necessary information requested in the application form.
  4. Documents that are needed for completing application procedure are listed under “Required Documents” section of this page.
  5. Applicant must carry both photocopies and originals of all those documents while applying for this procedure.
  6. Attach photocopies of documents along with the application form (whichever is necessary).
  7. Fee for this procedure depends upon the existing power connection and power requirements.
  8. Submit the application form and the required documents to the respective officer.
  9. If all above-mentioned procedures are followed properly, electricity connection permit for building will be provided within 3 months.



Advertisement

Required DocumentsEdit

  • ID Proof
  • Route Sketch Map
  • Copy of title deed
  • Land search documents for owner of property
  • Supply contract form
  • Wiring certificates
  • Consent from the property owner
  • Scaled site Plan
  • Load Schedule Details
  • Property tax



Office Locations & ContactsEdit

Ethiopian Electric Power Corporation
XQ58+452, Addis Ababa, Ethiopia
Contact number - +251111559567
Contact Link
Location link

Ministry of Water, Irrigation and energy
Addis Ababa, Ethiopia
Contact link
Location link

EligibilityEdit

Any person who:

  • Newly construction house or building with no existing electricity connection.
  • Existing connections which want to change the connection address, watt type, voltage etc.



FeesEdit

  • Fee for this procedure depends upon the type of connection and power requirements.



ValidityEdit

  • The validity for the electricity connection is forever.



Documents to UseEdit

Please attach documents that can be used by people. e.g. links



Sample DocumentsEdit

Please attach sample completed documents that would help other people.



Processing TimeEdit

  • The processing time for electricity connection permit for building will be provided within 3 months.



Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external 
websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.



InstructionsEdit

  • Applicant must complete the application form before submitting. Incomplete applications will not be accepted.
  • Applicant must provide genuine information while applying for this procedure.



Required InformationEdit

  • Type of Application
  • Name
  • Postal Code
  • Mobile Number
  • Email Address
  • Contact Person



Need for the DocumentEdit

  • Electricity permits help ensure that construction and major renovations or operations of electrical equipment comply with local bylaws, building codes as well as health and safety standards.



Information which might helpEdit

Enter other informations which might help.



Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.



External LinksEdit

link

OthersEdit

  • The power generation details link