Mexico - Obtain Authorization of Works Built by Third Parties, Which Will be Delivered to CFE (Federal Electricity Commission)

Revision as of 12:28, 1 May 2025 by Wesley (talk | contribs) (Auto)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Advertisement

ProcedureEdit

Apply In-Person:

  1. To Obtain Authorization of Works Built by Third Parties, Which Will be Delivered to CFE (Federal Electricity Commission), the applicant has to approach the Federal Electricity Commission (CFE) in Mexico link
  2. An application form will be provided to the applicant by the concerned officer.
  3. The applicant has to fill in all the necessary details in the application form. (Incomplete applications are not accepted)
  4. Make sure that the applicant has attached all the necessary documents that are mentioned in the “Required Documents” section of this page.
  5. The applicant has to attach photocopies of the required documents along with the application form while submitting it.
  6. Submit all the documents with the completed form to the concerned officer.
  7. The applicant has to pay the prescribed fee as requested by the authority.
  8. After receiving the application, the concerned authority will check the submitted application and document set. If all are in place, the application will be accepted.
  9. Then the application will be processed further. All the updates on the application status will be sent via SMS to the applicant’s mobile number.
  10. For further process, the applicant has to follow the instruction given by the officer.
  11. This entire process can be completed within 3 - 4 weeks or as per the timeline advised by the respective department authority.



Advertisement

Required DocumentsEdit

  • Application form
  • ID proof (Birth Certificate, national Identity card, etc)
  • Address proof – (Driving license, utility bill, etc)
  • Construction plan
  • Legal Documentation
  • Environmental impact assessment
  • Technical report
  • Any other documents (If required)



Office Locations & ContactsEdit

Federal Electricity Commission (CFE) in Mexico
National offices
Address: Av. Paseo de la Reforma 164, Col. Juárez, C.P. 06600, Ciudad de México. México
Contact: 55 5229 4400
Phone: 071 (within Mexico)
International Phone: +52 55 9191 0351
Email: [email protected]
Contact link

EligibilityEdit

  • Any property owner or a contractor who intends to Obtain Authorization of Works Built by Third Parties, Which Will be Delivered to CFE (Federal Electricity Commission) is eligible to make this application.



FeesEdit

  • The applicant has to pay the prescribed fee as requested by the authority.



ValidityEdit

Explain the time until which the certificate/document is valid.
e.g. Birth Certificate Valid Forever



Documents to UseEdit

Please attach documents that can be used by people. e.g. links



Sample DocumentsEdit

Please attach sample completed documents that would help other people.



Processing TimeEdit

  • This entire registration process can be completed within 3 -4 weeks or as per the timeline advised by the respective department authority.



Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.



InstructionsEdit

  • Applicants must complete the application form before submitting it. Incomplete applications will not be accepted.
  • Applicants must provide genuine information while applying for this procedure.



Required InformationEdit

  • Name
  • Surname
  • Address
  • ZIP code
  • Gender
  • Mobile number
  • Fax
  • Email
  • Nationality
  • Mailing address
  • Other details
  • Declaration
  • Date
  • Signature



Need for the DocumentEdit

  • Authorization of works built by third parties, which will be delivered to the Federal Electricity Commission (CFE) in Mexico, refers to the official approval granted by the CFE for infrastructure or electrical works constructed by entities other than the CFE itself.
  • This authorization allows the works to be connected to or integrated into the CFE's electrical network or infrastructure.



Information which might helpEdit

  • When third parties, such as property owners or developers, build electrical facilities, installations, or infrastructure that need to be connected to the CFE's network, they must obtain authorization to ensure compliance with technical standards, safety regulations, and legal requirements.



Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.



External LinksEdit

Link


OthersEdit

  • It also allows for the proper integration and coordination of the works with the CFE's systems and operations.
  • The specific requirements and procedures for obtaining authorization of works built by third parties will be outlined by the CFE.