Nigeria - Apply for Laying of Gas or Utility Pipe Lines Service to the Highways Planning and Development Department

Revision as of 11:38, 1 May 2025 by Wesley (talk | contribs) (Auto)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Advertisement

ProcedureEdit

Apply In-Person:

  1. To apply for Laying of Gas or Utility Pipe Lines Service in person, the applicant has to visit the Highways Planning and Development Department of the Federal Ministry of Works and Housing.
  2. The address and contact details can be found in the following contact link
  3. Visit the office with a letter of application to obtain Laying of Gas or Utility Pipe Lines Service from the Highways Planning and Development Department.
  4. Make sure that you have all the documents mentioned in the “Required Documents” section of this page.
  5. Attach the required documents with the letter of application and submit it to the relevant authority at the office.
  6. After successful submission, the applicant must pay the required charges for obtaining the service.
  7. On receipt of the stipulated payment, the agency will start the assessment of the application and verification of the attached documents.
  8. An Inspection by Ministry officials from Headquarters and Field office will be conducted at the applicant’s premises, jointly.
  9. Once all these processes are over and permit is ready to be issued, the applicant will be informed through phone or email to collect it.
  10. Subsequently, the applicant should also submit drawings of the same premises once after the Gas or Utility Pipelines has been laid.



Advertisement

Required DocumentsEdit

  • Letter of application
  • Drawing indicating the planned route of pipeline
  • Drawings after laying the pipelines
  • Required fees and proof of payment
  • Any supporting document (as required)



Office Locations & ContactsEdit

Highways Planning and Development Department - HQ,
Federal Ministry of Works and Housing
Headquarters,
Mabushi,
Abuja, Nigeria.
Phone: 234-(0)- 9 122 0581 61
Email: [email protected]
Website: Link

--$$$***---

      • Abia State***

Highways Planning and Development Department,
Ministry of Works and Housing
Abia State Government
1 Library Avenue
Umuahia Abia State
Email: [email protected]
Website : Link

Highways Planning and Development Department - HQ,
Federal Ministry of Works and Housing
Headquarters,
Mabushi,
Abuja, Nigeria.
Phone: 234-(0)- 9 122 0581 61
Email: [email protected]
Website: Link

EligibilityEdit

Any organization in Nigeria, that needs approval for laying Gas or Utility Pipelines on Nigerian Highways, can apply.


FeesEdit

Fee for approval of laying pipes initially is about 250 Naira per metre.
Approval for Thrust Boring in a single location costs 350000 Naira.
The applicant should also pay a maintenance fee of N100/metre, every year.


ValidityEdit

Explain the time until which the certificate/document is valid.
e.g. Birth Certificate Valid Forever



Documents to UseEdit

Please attach documents that can be used by people. e.g. links



Sample DocumentsEdit

Please attach sample completed documents that would help other people.



Processing TimeEdit

Processing time period for issuance of the approval is nearly three weeks.


Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&>
from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.gIn the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.



InstructionsEdit

  • Applicants are advised to complete the application form neatly and completely with absolute legibility and appropriateness to avoid rejections.
  • Also, all the required documents must be furnished completely.



Required InformationEdit

  • Business name
  • Registration number
  • Incorporation particulars
  • License number
  • Address of the firm
  • Phone number
  • Required route
  • Start and end points
  • Total length
  • Areas covered
  • Email address
  • Product description



Need for the DocumentEdit

An approval from the Highways Planning and Development Department is necessary for the companies that involve in excavation of the Right of Way/Setback to lay utility lines and use of thrust boring at road crossings.


Information which might helpEdit

Enter other informations which might help.


Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.



External LinksEdit

Reference


OthersEdit

More information which might help people.